Douro Basin
Station: Puente Pino


GRDC Station Information
STN Derived Subbasin Information
Station Name (GRDC ID): Puente Pino (6212420) Basin Name: Douro
River Name: Duero Next Downstream Station:Regua (6112090)
GRDC Country Code: SP Distance to Next Downstream Station: 125 km
Start Year [Month]: 1943 [10] Upstream Station(s): Villachica (6212400)
End Year [Month]: 1991 [12]
Mean Discharge: 279 m3/s
Minimum Discharge: 14 m3/s
Maximum Discharge: 2312 m3/s Length of Upstream Mainstem: 346 km
Mean Interstation Discharge: 137 m3/s Distance to Basin Outlet: 251 km
GRDC Catchment Area: 63160 km2 STN Catchment Area: 66878 km2
GRDC Interstation Area: 21304 km2 STN Interstation Area: 25296 km2
GRDC Station Runoff: 140 mm/yr STN Station Runoff: 132 mm/yr
GRDC Interstation Runoff: 202 mm/yr STN Interstation Runoff: 170 mm/yr
Station Field DescriptionsBasin Field Descriptions


Download
Site Descriptor Information Station Time Series Data


Hydrograph Station Data
Extreme Values Over Period Of Record
Month MeanQ
m3/s
MinQ
m3/s
MaxQ
m3/s
Jan 425.2 80.0 1709.0
Feb 565.6 69.0 2312.0
Mar 469.6 88.0 1315.0
Apr 365.3 99.0 885.0
May 298.9 71.0 857.0
Jun 187.4 50.0 465.0
Jul 115.6 22.0 242.0
Aug 77.9 14.0 195.0
Sep 117.4 28.0 189.0
Oct 150.5 55.0 353.0
Nov 254.1 91.0 1127.0
Dec 325.8 101.0 1509.0